Plan of works

An instrument used to plan the tasks of a work during a specific period of time, indicating problems and their possible solutions. It assigns a period of time during which each phase of the project will be developed. The following actions are key to this process: - Breakdown of the work into units. - Assignation of averages per unit, and allocation of resources per unit.