If the piping is visible, it must be correctly supported; if it is embedded it requires protection from building materials. Cold water and D.H.W. pipes must be thermally insulated, regardless of whether they are embedded or visible. If there is a false ceiling, the pipes may run across it; if not, they must be visible or embedded 10 cm from the finished roof. If piping is installed on interior roofs, the hot water pipe will be the highest. When there is crossed piping, the connection points will always be executed with the same pipework. The pipes will always be installed below the electric canalisations.