The masonry pieces should leave the workshop dressed correctly to be received as prepared. Before the positioning work on site, the stones are matched on a level surface and the necessary corrections and adjustments are made by specialists, sending the material back to the workshop for re-dressing when any faults appear either on the stone or during the application of the mounting planes.
The stones are then numbered on the bed or over-bed (never on the façade) according to the assembly order, the row and side where they expect to be placed.