The procedure for the settling of upper fascia parts and for on site installation of the previously mentioned pieces, includes the following operations: setting out beforehand, cleaning and irrigation of the row and the stone's bed, pouring on the mortar, estimating the level using a ruler and plumb bob, knocking the piece with the tamping rod or positioning mallet and horizontal verification, then proceeding to fill the perpends, pointing, re-pointing and refining the facings.